![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
Did do:
Dropped Babe off at school and Geoff off at work.
Painted 2nd coat of 2 ceilings (2 to go, eventually)
ruined sneakers at long last
picked Babe up (was dead last. Oops.)
spackled and sanded and damp-dusted walls to be painted
cuddled Babe after he fell off his bike (it was his first ever bloody nose)
made sure Babe was nice and warm as he drifted off to sleep
painted 1st coat of 1.5 rooms
somehow managed to not ruingood decent shoes, despite stepping in paint roller container
cleaned up table and kitchen area enough to eat in.
picked up Geoff from work
looked fruitlessly for fifth thingy to hold the kitchen light fixture up
To do tomorrow:
Get allergy shot
Go to library for story (half-) hour
(go to local farm for the scenery and bread)
choose color for other walls find other possible colors
choose color for grout
buy said color(s)
buy 'mushroom' grout
Paint 1st coat of other .5 room
paint 2nd coat of first 1.5 rooms
paint 2nd coat of .5 room
paint 1st coat of colored walls
sand and spray paint recessed light rims
prepare fridge for painting
go to choir
don't get cold (temperature or sniffles)
Maybe, if I'm lucky, Geoff or I will have a brainwave and remember where the fifth light fixture thingy is tonight or tomorrow. That way I won't have to add digging out the light fixture box from the non-accessible storage area to my list. Should really hook it up first to see if it even works before going to any trouble, though.
Dropped Babe off at school and Geoff off at work.
Painted 2nd coat of 2 ceilings (2 to go, eventually)
ruined sneakers at long last
picked Babe up (was dead last. Oops.)
spackled and sanded and damp-dusted walls to be painted
cuddled Babe after he fell off his bike (it was his first ever bloody nose)
made sure Babe was nice and warm as he drifted off to sleep
painted 1st coat of 1.5 rooms
somehow managed to not ruin
cleaned up table and kitchen area enough to eat in.
picked up Geoff from work
looked fruitlessly for fifth thingy to hold the kitchen light fixture up
To do tomorrow:
Go to library for story (half-) hour
(go to local farm for the scenery and bread)
buy 'mushroom' grout
Paint 1st coat of other .5 room
paint 2nd coat of first 1.5 rooms
paint 2nd coat of .5 room
sand and spray paint recessed light rims
prepare fridge for painting
go to choir
don't get cold (temperature or sniffles)
Maybe, if I'm lucky, Geoff or I will have a brainwave and remember where the fifth light fixture thingy is tonight or tomorrow. That way I won't have to add digging out the light fixture box from the non-accessible storage area to my list. Should really hook it up first to see if it even works before going to any trouble, though.
no subject
Date: 2008-10-08 02:53 am (UTC)no subject
Date: 2008-10-08 02:50 pm (UTC)