averygoodun42: (Default)
[personal profile] averygoodun42

Paint entryway ceiling (1st coat tonight, 2nd coat tomorrow morning)
paint entryway walls (tomorrow after ceiling's 2nd coat finish up)
paint fridge (Saturday?)
grout tiles (Saturday)
finish shelves (before caulking)
fix door jam (weekend)
make cabinet panels (tomorrow)
install baseboard (tomorrow or weekend)
wire display cabinet (Geoff)
fix dishwasher (Geoff)
reinstall over fridge shelf (Geoff)
sand display cabinet (TBD)
cut and install display cabinet trim (tomorrow or weekend)
caulk everything (weekend)
paint (with Impervo):
  • display cabinet
  • shelves
  • stair ledges
  • all door and window casings
  • front and back doors
  • baseboard
  • cabinet sides
  • cabinet panels
  • any remaining trim
  • DC door, when it comes (Tuesday!)

Install door knobs and handles
Install recessed light rims (next Wednesday)


Yeah. Halloween is being optimistic. However, if Geoff actually helps out beyond the wiring... Gosh, that sounded bitter, didn't it? Didn't intend it to. Really, I didn't.

Profile

averygoodun42: (Default)
averygoodun42

April 2020

S M T W T F S
   1234
567891011
12131415161718
192021 22232425
2627282930  

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Mar. 9th, 2026 07:46 pm
Powered by Dreamwidth Studios